Extreme Networks BlackDiamond 10808 Installation Guide Page 70

  • Download
  • Add to my manuals
  • Print
  • Page
    / 88
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 69
70 Extreme Networks BlackDiamond 10K-Series Switch Installation Guide
BlackDiamond 10808 Switch Power Supplies and Power Supply Controllers
The front panel of the power supply controllers provide status LEDs. Table 17 describes the LED
behavior on the power supply controllers.
Installing the Power Supply Controllers
To install a power supply controller:
1 Attach the ESD strap that is provided to your wrist and connect the metal end to the ground
receptacle that is located on the top-left corner of the BlackDiamond chassis front panel.
2 If a blank faceplate is covering the power supply controller bay, remove it and save it for future use.
3 Ensure that the power supply controller is right side up.
4 Slide the power supply controller into the slot, aligning the notch on the top of the slot with the
power supply controller.
5 Use the thumbscrews and a #2 Phillips screwdriver to secure the power supply controller into the
slot.
Verifying a Successful Installation
After you supply power to the switch, the switch performs a power-on self test (POST).
During the POST:
All ports are temporarily disabled.
The packet LED is off.
The power LED is on.
The MGMT LED flashes until the switch successfully passes the POST.
If the switch passes the POST, the MGMT LED blinks at a slow rate (one blink per second). If the switch
fails the POST, the MGMT LED shows a solid yellow light.
Table 17: Power supply controller LEDs
LED Color Indicates
STATUS Amber
Green
Diagnostics in progress.
Normal operation.
MASTER Blinking Green
Off
Unit is master.
Unit is slave.
PoE PWR CTRL STATUS Green
Amber
Link idle.
Link busy.
PoE PWR CTRL ERROR Off
Amber
No errors detected.
Errors detected.
Page view 69
1 2 ... 65 66 67 68 69 70 71 72 73 74 75 ... 87 88

Comments to this Manuals

No comments