Installing the Chassis
Extreme Networks BlackDiamond 10K-Series Switch Installation Guide 43
To ground the chassis:
1 Strip 0.5 inch (1.2 cm) of insulation from the 14 AWG, high strand-count copper wire cable.
2 Insert the cable into the cable lug.
CAUTION
Ensure that no copper is visible between the lug and the cable insulation.
3 Tighten the cable retention screw, using a
1
/
4
”
or
5
/
16
”
flathead screwdriver, to 20 in-lbs of torque.
4 Attach the ground lug, lock washers, and nuts (in that order) to the grounding studs on the rear of
the chassis. Tighten the nuts to 125 in-lbs of torque.
Comments to this Manuals