Evaluating and Meeting Cable Requirements
Extreme Networks BlackDiamond 10K-Series Switch Installation Guide 29
Installing Cable
Consider the following recommendations when you connect cable to your network equipment:
• Examine cable for cuts, bends, and nicks.
• Support cable using a cable manager that is mounted above connectors to avoid unnecessary weight
on the cable bundles.
• Use cable managers to route cable bundles to the left and right of the network equipment to
maximize accessibility to the connectors.
• Provide enough slack—approximately 2 to 3 inches (5.08-7.62 cm)— to provide proper strain relief as
shown in Figure 6.
• Bundle cable using velcro straps to avoid injuring cables.
• If you build your own cable, ensure that cable is properly crimped.
• When installing a patch panel using twisted pair wiring, untwist no more than 1 inch (2.54 cm) of
the cable to avoid RF interference.
• When required for safety and fire rating requirements, use plenum-rated cable. See your local
building codes for determining when it is appropriate to use plenum-rated cable, or refer to IEC
standard 850.
• Keep all ports and connectors free of dust.
NOTE
Unshielded twisted pair (UTP) cable can build up ESD charges when being pulled into a new
installation. Before installing category 5 UTP cables, discharge ESD from the cable by plugging it into a
port on a switch or any network device that is not powered on.