Extreme Networks BlackDiamond 12804 User Manual Page 91

  • Download
  • Add to my manuals
  • Print
  • Page
    / 160
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 90
Extreme Networks 325 W DC Power Supply
BlackDiamond 12800 Series Switches Hardware Installation Guide
91
To install an Extreme Networks 325 W DC PSU:
1 Attach an ESD-preventive wrist strap to your wrist and connect the metal end to the ground
receptacle on the top right corner of the switch front panel.
2 Make sure that the Extreme Networks 325 W DC PSU is right side up (see Figure 52).
Figure 52: Extreme Networks 325 W DC PSU
3 Carefully slide the PSU all the way into an open power supply bay (see Figure 53) until you hear a
click.
Extreme Networks recommends that you populate the two left power supply bays before the two
right power supply bays. Refer to Table 19 for the recommended installation sequence.
NOTE
A minimum of two Extreme Networks 325 W DC PSUs are required to run a BlackDiamond 12802 switch.
WARNING!
Do not put your hand into an open power supply bay when a power supply is not present. Empty power supply bays
require a cover plate at all times.
CAUTION
Do not slam the Extreme Networks 325 W DC PSU into the system switch backplane.
CAUTION
To prevent an electrical hazard, make sure before you install the PSU in the power supply bay that the DC power
cord is not connected to the PSU.
Table 19: Recommended Installation Sequence (View from Rear of Chassis)
Left Power Supply Bays Right Power Supply Bays
Installation # 1 Installation # 3
(If this bay is empty, a cover plate is required.)
Installation # 2 Installation # 4
(If this bay is empty, a cover plate is required.)
.
325W DC PSU
Torino DC PSU_04
A
Page view 90
1 2 ... 86 87 88 89 90 91 92 93 94 95 96 ... 159 160

Comments to this Manuals

No comments